Site Investigation - General
Mary Rose
Trial Pitting
Stag Lane, IoW, Air Balloon School, Blenheim Palace
Site Monitoring & In-Situ Testing
Iver Sub Station, Hereford Market
Site Investigation - Transport
Highways
A21 Bewl Water, Motorway Mayhem
Rail
Gatwick Airport Railway Station
Electrokinetic
A21 Electrokinetic Slope Stabilisation
Site Investigation - Utilities
Power Transmission
Kings Worthy, Willesden, Iver Sub Station
Power Generation
Maerdy Windfarm
Water
Cotswold Canal Restoration Phase 1a
Drilling Boreholes
Hartlebury Landfill
Geotechnical Drilling
Rock Wall, Marlborough Mound, Hereford Market, Blenheim Palace
Geo-environmental Drilling
Harwell, Stag Lane, IoW, Air Balloon School
Ground Source Heat Drilling
Worksop Social Housing, GSH householder
Soil & Rock Testing
St Petersburg Mining Institution, Cotswold Canal Restoration Phase 1a
Geo-environmental & Geotechnical Consultancy
Burgess Park, Stonehenge, The Italia Conti Academy